Company Profile
Shandong Jiuyuan Steel Structure Co., Ltd. was established on May 28, 2020 with a registered capital of 10 million yuan. It has the Second-level qualification for professional steel structure contracting issued by the Ministry of Housing and Urban-Rural Development.
Our company located in the modern industrial park high tech zone of Liaocheng City, covering an area of 32,000 square meters. And have 120 employees, among which 15 have the titles of enterprise engineering technology and economic management.
Our company is mainly engaged in the production and installation of steel structure products, which are widely used in various industrial plants, stadiums, new energy structures and other fields. Has advanced production equipment, inspection equipment and office equipment.
The company always adheres to the enterprise tenet of "Integrity-based, customer first", implements the management policy of "Integrity management, casting high-quality products, abiding by laws and regulations, creating green, harmony and health", and vigorously advocating "unity and struggle, pioneering and seeking truth" , Diligent construction, striving for first-class "enterprise spirit, with management as the basis, quality as life, to provide our customers with the best quality service.
Product Description
Customized Prefabricated Pole Barn Kits Building Steel Structure Warehouse Farm Shed Prefab Workshop Self Storage Metal Building Introduction
Steel structure office building |
Item |
Specification |
Steel column |
Q235,355B welded square tube column/Box column |
Steel beam |
Q235,355B welded H section steel/hot-rolled H section steel |
Steel purlin |
C/Z section purlin or square tube column |
Downpipe |
UPVC |
Gutter |
Stainless steel gutter/UPVC gutter |
Roof material |
Corrugated steel sheet/sandwich panel |
Wall material |
Sandwich panel and glass curtain wall |
Door |
Aluminium door |
Window |
Aluminium window |
What is Customized Prefabricated Pole Barn Kits Building Steel Structure Warehouse Farm Shed Prefab Workshop Self Storage Metal Building ?
Steel structure building is built over three members connected to each other by bolts and screws:
Primary members (columns, beams)
Steel columns will be H section steel, square tube steel according to different type of buildings. Steel beams are usually H section steel.
Secondary members (C or Z purlins, bracing...)
Roof and wall sheeting or sandwich panel (EPS, fiberglass wool, PU sandwich panel)
Other building components (Rolling doors, aluminium windows, etc.)
The entire primary members and secondary members are designed and fully fabricated including cut-to-length, punching, drilling, welding and performing in the factory before shipping to the site for erection.
At the site, all components are assembled and jointed via nut & bolt connections; thereby reducing the costs and assembly times.
These buildings can be provided with different structural and non-structural additions such as ventilators, doors & windows, trusses, mezzanine floors, canopies, crane, insulation…, based on the customer's requirements.
Detailed Photos
1, Detailed Production photos of Customized Prefabricated Pole Barn Kits Building Steel Structure Warehouse Farm Shed Prefab Workshop Self Storage Metal Building
2, Detailed Materials of Customized Prefabricated Pole Barn Kits Building Steel Structure Warehouse Farm Shed Prefab Workshop Self Storage Metal Building
Installation Instructions
Installation of Customized Prefabricated Pole Barn Kits Building Steel Structure Warehouse Farm Shed Prefab Workshop Self Storage Metal Building
Our Advantages
Benefits of Customized Prefabricated Pole Barn Kits Building Steel Structure Warehouse Farm Shed Prefab Workshop Self Storage Metal Building
1,Cost Savings Price per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process.
2. Quality Control Designed and fabricated in-factory with strict quality control. The fabrication process includes design and engineering, as well as detailing and manufacturing at the factory.
3. Quick Erection All steel components are fabricated at the factory and linked by bolts at the site. So the erection process is fast, step by step, easy to install.
4. Flexibility Steel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs.
5. Energy Efficiency Nowadays, steel buildings are the green solution for the environment with CO2 reduction, energy efficiency, and recycle.
Warmly welcome your inquiry, if convinent please help fill in the following questions, which will be helpful for us to make proposal soon.
1 Location (where will be built? ) _____country, area
2 Size: Length*width*height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height)____kn/m2, _____mm
5 anti-earthquake _____level
6 Brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not,
the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height ___m.