Customization: | Available |
---|---|
Tolearance: | 1% |
Life Span: | 50 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Reasons to Use Steel Structure
|
|
Cost-effective
|
Compared to other framing materials, structural steel brings greater value to a project in terms of initial cost as well as reduces costs in other areas.
|
Accelerated schedules
|
Structural steel is fabricated off-site while preliminary site preparation and foundation work are being performed. It is then brought to the site and rapidly erected, accelerating the overall project schedule.
|
Quality
|
Structural steel is fabricated off-site under controlled conditions, ensuring a high-quality product and reducing the number of costly fixes at the job site.
|
Green
|
Today's modern steel mills produce steel containing an average of 90% recycled material. At the end of a building's life cycle, 100% of the steel frame can be recycled
|
Safety
|
By using prefabricated building solutions construction time is significantly shorter, meaning less time and fewer reasons for accidents to occur.
|
Future Adaptability
|
Steel buildings and frames are easily expanded either upwards or to any side. Because steel is extremely strong for its weight it can support the added weight of
|
Fabrication of Steel structure building
Materials of the wall and roof system:
Advantages of the steel frame building:
1. We can offer you the manual include the photos and drawings, or some videos for help you on the
installation. And you will organize the local people to install it. 93% of our clients finished their
houses in this way.
2. We can send our people to your site to guide your people to install. Or send team people (3-5
people) to your site to install for you. This way is most easy way, but you need to pay their round-
way tickets, local food, accommodation, transportation, communication and salary, and also their
security on the site. Almost 5% of our clients choose this way. And in the normal we will require the
order should be more than 100000USD.
3. You can send your people (engineers or the technician) to our co- mpany to study the installation
details. 2% of our clients choose this way for their orders.
Shandong Jiuyuan Steel Structure Co., Ltd. was established on May 28, 2020 with a registered capital of 10 million yuan. It has the Second-level qualification for professional steel structure contracting issued by the Ministry of Housing and Urban-Rural Development.
Our company located in the modern industrial park high tech zone of Liaocheng City, covering an area of 32,000 square meters. And have 120 employees, among which 15 have the titles of enterprise engineering technology and economic management.
Our company is mainly engaged in the production and installation of steel structure products, which are widely used in various industrial plants, stadiums, new energy structures and other fields. Has advanced production equipment, inspection equipment and office equipment.
The company always adheres to the enterprise tenet of "Integrity-based, customer first", implements the management policy of "Integrity management, casting high-quality products, abiding by laws and regulations, creating green, harmony and health", and vigorously advocating "unity and struggle, pioneering and seeking truth" , Diligent construction, striving for first-class "enterprise spirit, with management as the basis, quality as life, to provide our customers with the best quality service.
Warmly welcome your inquiry, if convinent please help fill in the following questions, which will be helpful for us to make proposal soon.
1 Location (where will be built? ) _____country, area
2 Size: Length*width*height _____mm*_____mm*_____mm
3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. Snow height)____kn/m2, _____mm
5 anti-earthquake _____level
6 Brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not,
the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height ___m.