Customization: | Available |
---|---|
After-sales Service: | Installation Guiding |
Connection Form: | Bolt Connection |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Parameters of Light weight steel structure workshop
Steel structure office building |
|
Item |
Specification |
Steel column |
Q235,355B welded square tube column/Box column |
Steel beam |
Q235,355B welded H section steel/hot-rolled H section steel |
Steel purlin |
C/Z section purlin or square tube column |
Downpipe |
UPVC |
Gutter |
Stainless steel gutter/UPVC gutter |
Roof material |
Corrugated steel sheet/sandwich panel |
Wall material |
Sandwich panel and glass curtain wall |
Door |
Aluminium door |
Window |
Aluminium window |
1. Cost Savings Price per square meter can be 25% lower than conventional buildings. Site erection cost is low because of faster erection times and easier process. 2. Quality Control Designed and fabricated in-factory with strict quality control. The fabrication process includes design and engineering, as well as detailing and manufacturing at the factory. 3. Quick Erection All steel components are fabricated at the factory and linked by bolts at the site. So the erection process is fast, step by step, easy to install. 4. Flexibility Steel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs. 5. Energy Efficiency Nowadays, steel buildings are the green solution for the environment with CO2 reduction, energy efficiency, and recycle.